I think the temperature was 28 degrees. Scott worked outside all day, and he got half the floor installed.
It took longer than usual because originally he thought he was going to use Trex, which need to be inset behind the lower facing board because they're ugly on the ends when you cut them. In the end, he decided to use wood, but the facing board was already in, so he had to cut the floor boards carefully and fit them in, rather than simply nailing them on top of the joists and then running his saw across to cut them evenly.
He said he saw bald eagles all day long. And the sun sets over the river in the winter giving him a nice view. But yikes that's ice in the river.
It took longer than usual because originally he thought he was going to use Trex, which need to be inset behind the lower facing board because they're ugly on the ends when you cut them. In the end, he decided to use wood, but the facing board was already in, so he had to cut the floor boards carefully and fit them in, rather than simply nailing them on top of the joists and then running his saw across to cut them evenly.
He said he saw bald eagles all day long. And the sun sets over the river in the winter giving him a nice view. But yikes that's ice in the river.
RSS Feed