Reusserland
  • Links
  • Sewing
  • Music
  • Travels
  • The River House

Porch Day Four

12/4/2025

0 Comments

 
I think the temperature was 28 degrees. Scott worked outside all day, and he got half the floor installed.

​It took longer than usual because originally he thought he was going to use Trex, which need to be inset behind the lower facing board because they're ugly on the ends when you cut them. In the end, he decided to use wood, but the facing board was already in, so he had to cut the floor boards carefully and fit them in, rather than simply nailing them on top of the joists and then running his saw across to cut them evenly.

He said he saw bald eagles all day long. And the sun sets over the river in the winter giving him a nice view. But yikes that's ice in the river.
Picture
Picture
Picture
0 Comments



Leave a Reply.

    Author

    We bought a tiny cottage on the Portage River. It's a fixer-upper.  This page will document the improvements. One day, we will live here.

    Archives

    December 2025
    November 2025
    October 2025
    September 2025
    August 2025
    July 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024

    Categories

    All
    Bathroom
    Bedroom
    Design
    Exterior
    Garage
    Infratructure
    Kitchen
    Landscaping
    Living Room
    Loft
    Office
    Riverfront
    Sunroom
    Trash

    RSS Feed

    Links

    https://futonland.com/
Proudly powered by Weebly